OIL and GAS

Star Refinery Consolidated Engineering Works

Star Refinery Consolidated Engineering Works

NAME OF CLIENT Star Refinery Inc.

CONTRACT YEAR 2019
LOCATION Aliaga/Izmir/ Turkey

PROJECT DESCRIPTION In project scope; Architectural, engineering services and preparation of tender documents for New Refinery Entrance with 375 m2 Security Building, Sulfur Storage Area with a total construction area of 2.170 m2, and Office and Workshop Buildings for Subcontractors on an area of approximately 30.000 m2 are provided.

SERVICES

  • Conceptual design
  • Detail design (Architecture, steel and reinforced concrete structure, electric installation, mechanical installation , piping, infrastructure, geotechnical design)
  • Fire security and fire fighting design
  • Material take-off and cost analysis
  • Tender preperation and procurement support

TPIC Ceyhan Petroleum Storage Terminal

TPIC Ceyhan Petroleum Storage Terminal

NAME OF CLIENT TPIC (Turkish Petroleum International Company)

CONTRACT YEAR 2018
LOCATION Ceyhan /Adana/Turkey

PROJECT DESCRIPTION The plant capacity is 1 million tons. It contains 17 diesel tank with 712.000 m3 in total, 9 jet A-1 fuel with with 396,500 m3 in total and 4 fuel oil tank with 121,500 m3 in total. The plant has both a jetty and a land terminal for loading and unloading facility.  All of the main and auxilary systems are in the scope of the study.

SERVICES

  • FEED documentation
  • EPC tender document preperation
  • Feasibility study
  • HAZOP study

Tupras İzmit Refinery Phase-3 Sulfur Storage Area

Tupras İzmit Refinery Phase-3 Sulfur Storage Area

NAME OF CLIENT TUPRAS Turkey Petroleum Refinery Inc.

CONTRACT YEAR 2018
LOCATION İzmit/Kocaeli/ Turkey

PROJECT DESCRIPTION The design of drainage system for the drainage of rain and wash water accumulated in the area by enclosing the sulfur storage area specified in the plan annexed to the specification annexes with reinforced concrete curtain walls, the design of the water collection pit with solid particulate sulfur precipitation / separation chamber for the collection of water, the discharge of the accumulated sulfur in the pit into the pond and the connection of the water in the channels to the OWS system were designed. 

SERVICES

  • Basic design
  • Detail design (Architecture, reinforced concrete structure, electric installation, instrumentation, mechanical installation , piping, infrastructure, geotechnical design)
  • 3-D smart BIM modelling
  • Material take-off and cost analysis
  • Tender documents preperation 

Tupras Izmir Refinery New P124, P125 Pumps

Tupras Izmir Refinery New P124, P125 Pumps

NAME OF CLIENT TUPRAS Turkey Petroleum Refinery Inc.

CONTRACT YEAR 2018
LOCATION Aliaga/Izmir/ Turkey

PROJECT DESCRIPTION The project includes the provision of new atmospheric slurry pumps to be supplied for the CDU unit at the Tüpraş İzmir Refinery, revision of existing pipelines to new pumps, design of pump foundations, electrical and instrumentation. 

SERVICES

  • Basic design
  • Detail design (Steel and reinforced concrete structure, electric installation, instrumentation, mechanical installation , piping design)
  • 3-D smart BIM modelling
  • Material take-off and cost analysis
  • Tender documents preperation