MINING

Lapseki Gold Mine Plant Extension

Lapseki Gold Mine Plant Extension

NAME OF CLIENT: Tumad Mining Industry and Trade Inc.

CONTRACT YEAR: 2021
LOCATION: Çanakkale, TURKEY

PROJECT DESCRIPTION: Lapseki Gold Mine Plan's capacity is aimed to increase upto 1.5 million tons/year. The engineering study has been performed with the update of the NI43-101 feasibility report.

SERVICES: 

  • Basic design
  • Detail design (Architecture, steel and reinforced concrete structure, electric, automation, instrumentation, mechanical installation and equipment, piping, infrastructure, geotechnical design)
  • Material take-off and cost analysis
  • Tender preperation and procurement support

Anatolia Iron Mine Project