MINING

Oksut Gold Mine Existing Mine Laboratory Modifications Design Services

.

Oksut Gold Mine Existing Mine Laboratory Modifications Design Services.

NAME OF CLIENT: Oksut Mining Industry and Trade Inc.

CONTRACT YEAR: 2023
LOCATION: Kayseri/Turkey

PROJECT DESCRIPTION: The renovation design of the existing mine laboratory was conducted and the laboratory is updated to provide the necessary requirements.

SERVICES: 

  • Site studies
  • Architectural design
  • Electrical installation and instrumentation design
  • Mechanical installation design
  • Bill of Quantities and tender documents

Detail Engineering for Port of Stockton Project

.

Detail Engineering for Port of Stockton Project.

NAME OF CLIENT: Denmar US LLC

CONTRACT YEAR: 2023
LOCATION: Stocton, CA/U.S.A.

PROJECT DESCRIPTION: CLIENT has a soda ash handling plant investment in Stockton California. The plant unloads the soda ash which is transported by train and loads them into the vessels with ship loaders. The plant also consists of conveyors and a storage house in the facility area.

SERVICES: 

  • Engineering Coordination
  • Basic Design 
  • Final Detail design Works     
  • 3D Model Generation

Engineering Services for Modification of 3rd Tetiary Screen for Ivrindi Gold Mine Plant

.

Engineering Services for Modification of 3rd Tetiary Screen for Ivrindi Gold Mine Plant.

İŞVEREN: Tümad Madencilik Sanayi ve Ticaret A.Ş.

SÖZLEŞME YILI: 2023
YERİ: İvrindi/Balıkesir

PROJE TANIMI: Tesisteki mevcut tersiyer elek binasına 3. Tersiyer elek ilavesi mühendislik çalışması yapılmıştır. Yeni elek yapısı için genel yerleşim çalışması yapılmıştır. Yeni eleğe malzeme alınması için gerekli revizyonlar planlanmıştır.

Yeni elek taşıyıcı yapısı ve temeli tasarlanmıştır. Yeni elek öne ve arka akımlarını alabilmek için konveyör hatlarında gerekli modifikasyon çalışmaları yapılmıştır. Yapı içerisinde gerçekleştirilen revizyonlardan dolayı zora giren araç girişi için yeni kapı yerleri planlanmıştır. Toz toplam sistemin ve P&ID revizyonları yapılmıştır.

SERVİSLER: 

  • Genel Yerleşim
  • Mekanik tasarım
  • Çelik ve Betonarme yapı tasarımları
  • Mimari tasarım
  • Yaklaşık Maliyet ve İhale Dosyasının Hazırlanması

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NAME OF CLIENT: Tumad Mining Industry and Trade Inc.

CONTRACT YEAR: 2023
LOCATION: Balikesir / TURKEY

PROJECT DESCRIPTION: Engineering work has been carried out for the addition of the 3rd tertiary screen to the existing tertiary screening building in the facility. A general layout study has been conducted for the new screen structure. Revisions have been planned to procure materials for the new screen.

The new screen support structure and foundation have been designed. Necessary modifications have been made to the conveyor lines to accommodate the flow of material to the new screen. New gate locations have been planned to facilitate vehicle access due to the revisions made within the structure. Revisions have been made to the dust collection system and P&ID

SERVICES: 

  • General layout
  • Mechanical design
  • Reinforced concrete and steel structures design
  • Architectural design
  • MTO and tender dossier

Gravity Line Revision for New Liberty Gold Mine Plant

.

Gravity Line Revision for New Liberty Gold Mine Plant.

An additional line (Appendix 1) has been taken from the cyclone underflow of the ball mill in the facility, and the ore has been directed to a new three-outlet distributor box. One outlet of the distributor box is connected by gravity to the new Vertimill discharge tank, while the other two outlets are fed by gravity to the existing Vertimill discharge tank. In the existing CIL tank area of the facility, a CIL feed tank supplied from the existing first plant thickener has been placed, and feeding to all CIL tanks is provided through a pressurized line from this tank. The project covers the engineering services of the specified piping lines, including their supports, foundations, and the CIL feed tank to be added to the system.